Project introduction
Bohe new Port area east and west breakwater project
简 介:
The east breakwater project is 5423 meters long, the west breakwater project is 3315 meters long, and the width of the mouth is 600 meters。Vertical caisson structure is adopted for the head section of the mouth gate dike, and ripped-slope dike structure is adopted for the other sections of the dike. A total of 10.6 million m3 of various stone materials need to be thrown and filled, and 82 of concrete needs to be poured.60,000 m3, the total project investment is 25.4.5 billion yuan, 17 for construction and installation.94亿元。After the completion of the east and west breakwaters, the harbor pool will cover an area of 6 square kilometers, the shoreline will be 10,850 meters, and 30-35 berths of 300-300,000 tons can be built, with a designed throughput of 200 million tons。
了解详情>>
Bohe new port area east Pavilion mountain reclamation project
简 介:
This project is initiated in the name of "Coal Storage Yard Project of Bohe New Port District in Maoming Port" and "Chemical Storage Project of East District of Bohe New Port District in Maoming Port"。
了解详情>>
Maoming Bohe Bay New City east area phase land construction project
简 介:
Use the sea area of 129.42 hectares with a land area of 136.31 hectares, forming 249 construction land.03公顷。According to the proposal, the total investment of reclamation works is 76160.680,000 yuan, construction and installation cost 56,578.51万元。The total investment in municipal projects is about 1.1 billion yuan。The total investment of this project is about 1.9 billion yuan。
了解详情>>
Guangdong Yudian Maoming Port Bohe New Port coal wharf project
简 介:
Yuedian Group plans to build one 100,000-ton coal unloading dock (designed according to 150,000 ton structure) and one 3.The 50,000-ton coal loading dock, 2 working ship docks and supporting port facilities, and serves as the coal distribution and strategic reserve base of Yudean Group。
The designed total throughput of the terminal is 16 million tons/year, including 10 million tons/year of coal unloading and 6 million tons/year of coal loading。Highway outbound coal transport capacity is about 500,000 tons, railway outbound coal transport capacity is 3.5 million tons, coal blending capacity is 10 million tons/year。
了解详情>>
Sinochem fertilizer terminal
简 介:
拟建设2个10万吨级化肥泊位,码头长度575m;配套设置化肥装卸工艺设备、库房、水电控等设施。
The project investment is estimated at 1.2 billion yuan。
了解详情>>
Sinochem 50,000-ton liquid chemical berth project
简 介:
中化集团建设1个5万吨级石化泊位(结构按8万吨级设计),码头的总吞吐量为240万吨/年;总设计吞吐能力为315万吨/年(远期为350万吨/年)。A petrochemical storage area of 1 million cubic meters will be built。Among them, the wharf construction investment is 5.99亿元。